Pressure vessel manufacturing inspection (ASME)

Duration : 2 days
Course Content :

-Inspector`s duties & responsibilities.
-Material certificate EN10204
-Control of document (IIP,WPS,PQR,WPQ,NDT MAP)
-Control of Material Traceability
-Control of NDT activities & reports
-Control of PWHT & records
-Hydrostatic & peneumatic test
-Control of Name Plate
-Control of surface preparation & painting
-nonconformance reports