Risk Based Inspection

Duration : 3 days
Course Content :


• Recommended Practice for Risk-Based Inspection (API RP 580)
• Base Resource Document on RBI (API Publication 581)
• Why RBI analysis is used.
• The benefits and limitations of various RBI technologies.
• Differences between qualitative and quantitative approaches to RBI methods.
• The scope of equipment covered in RBI techniques.
• How RBI provides input to minimum requirements for programs that meet RP 580.
• Computerized Maintenance Management Systems, and enterprise schedule/tracking.
• Class exercises, such as determining remaining life of real process equipment and optimizing Maintenance and inspection intervals.
• Implementing RBI projects.
• Implementing risk mitigation concepts.