1-Inspection during construction and installation of metal structures and cement silos (including welding, dimensional, paint, etc.) in the development plan of Zabol Cement Company weighing 1000 tons in 1998 and 1999

2-Inspection during operation of 200 pressurized tanks in different volumes and pressures, including inspection by conventional UT and advanced ultrasonic TOFD and Phased Array, PT, MT, thickness measurement, material analysis, pressure testing, calculation booklet and operation certification during Several contracts from 1992 to 1999 in the sensitive industries of the country

3-Providing serviceability assessment (FFS) services for the propane tank of Khark Petrochemical Company with a capacity of 260,000 barrels with the aim of performing internal and external inspections, advanced calculations, ordinary and advanced ultrasonic tests, thickness measurement, leveling and mapping of the foundation and body Reservoir, evaluation of reservoir meeting and determination of deviation from vertical and circular positions, etc. were performed by the experienced FFS team of this company in May 1992 at Khark Petrochemical Complex.

4-Deployment of resident inspectors in international projects of Mapna Tose'e Company, including the ACC project of Rumilah, Iraq and the construction of the main cooling system equipment of Basra power plant for excellent supervision of the construction and installation process, including supervision of welding, dimensional, material, paint and coating inspections. ... During the year 98 and 99 with a tonnage of 7000 tons

5-Obtaining over 250 qualification tests for welders, conducting tests and issuing valid welding certificates for welders of Auto shassis International Company (ACI PARS), the manufacturer of Renault car chassis in Iran, according to ISO 9606 standard and approved by Renault France.

6- Providing welding inspection services by UT, RT, PT, VT methods in the project of making tanks and piping 23 fire engines belonging to the Petroleum Products Distribution Company at the factory of Sangin Kar Sanat Engineering Company in 1995 and 1996.

7-Providing welding inspection services by radiographic (X-Ray), UT and PT methods on accordion joints in Expna Joint projects in Mapna, Airtik, Shahid Hasheminejad Refinery, Copper Industries, Sirjan Steel, Bushehr Petrochemical, Abadan Refinery, etc. In the factory of Flex Sane Company in the years 92 to 99

8-Providing welding inspection services, PT, UT, RT, material approval, welding qualification control, etc. in projects of manufacturing more than 40 heat exchangers in Royan Tajhiz Jam Company in the years 93 to 98, including Isfahan power generation management projects, Biston Petrochemical , Tehran Oil Refinery, Maroon Petrochemical, Shazand Oil Refinery, Sepahan Oil and Isfahan Refinery.

9-Providing ultrasonic testing (UT) services on welding joints and raw materials in the construction and installation of gas platforms and offshore structures of phase 4 and 5 of South Pars in Bushehr and Assaluyeh under the supervision of ENI Italy in 2004 and 2005

10-Provision of industrial radiography (x-Ray) services and film interpretation by a Level III expert on Expansion Joint connections in the direct reduction project of Ghaenat Steel under the supervision of Iritek

11-Providing welding inspection and NDT services including MT, UT in the project of manufacturing industrial conveyor equipment and its ancillary structures weighing a total of 500 tons in Tamin Sanat Pars Company

12-Inspection during the construction of pressure vessels (10 vessels) including welding inspection by UT, RT methods, obtaining a qualification test from welders, reviewing and approving manufacturer's documents, monitoring pressure testing, etc. in the project of Gol Gohar Industrial and Mining Company

13-Providing high supervision and technical inspection services in the construction of industrial sheds of Caspian Oil Company in the amount of 1200 tons under the supervision of Rah-e-Sanat Ouj Company

14-Participation in the project of industrial and non-industrial structures of Bidboland gas refinery as a Third Party inspector for excellent supervision and control of all stages of construction and installation of the project in the amount of 3000 tons built in Azaran Industrial Structures Company under the supervision of National Construction Company

15- Welding inspection by UT, MT methods on the parts of giant Gantry cranes in Sadr class highway project in the installation stage at the request of Payab Zamzam company

16- Welding inspection and NDT including UT, RT, MT in the project of manufacturing factory patches for repairing oil pipelines for Iran Oil Pipelines and Telecommunications Company in South Rotary Machinery Company

17- Technical inspection including welding inspection by UT, RT, PT methods, dimensional control, material control, control of welders' qualifications and pressure monitoring in the construction project of 8 heat exchangers of Behran Oil Company made in Saba Brodat Pars Company

18- Welding inspection by MT, RT, PT methods on Piping welded joints under pressure in the gas supply project for Zanjan city by Akam Oil and Gas Consortium

19- Training, consulting and establishing ISO 3834 standard in various companies including Iran Khodro Diesel Company, Mammut Company, Salafchegan Pipe and Coating Company,farayand Atlas Energy Company, Balar Nasab Rasht Company, South Rotary Machinery Company, Shiraz Gas Company, Semnan Gas Company, Bina Design and Construction Company, Toos Hengam Company, Industrial Management Center (Contractors of Fars Province Gas Company) and ...

20- Welding inspection by UT, RT methods on Piping welded joints and ammonia pressure tanks of Kaleh Dairy Company of Tehran